Scaffoldings & FrameWork System - Fermar

 
INDUSTRIAL ACCESS SA - Access & Lifting Division

 

Finance by BRD Sogelease IFN S.A.

 

Finantare prin BRD Sogelease IFN S.A.

 

 


 

Industrial Access SA -
Acces & Lifting Division

Phone     +40 21 313.02.00
Mobile     +40 747 28.85.60

 

Contact form

 

www.industrialaccess.ro

 

www.nacele-jlg.ro
www.niftylift.ro
www.lionlift.ro
www.nacele-geda.ro
www.uniccrane.ro
www.mastexplorer.ro
www.instantupright.ro
www.fermar.ro

 


Products » For sale products » Scaffoldings

MODEL FER-48 EUROPEAN

MODEL FER-48 EUROPEAN
* Click on the image to view
 
  - Modular System of frames and gateways manufactured in steel of high quality in tube of diam. 48 mm.
  - Metal bars and diagonals in tube of diam. 42 mm, hot galvanized.
  - All kind of accessories to make easier and safe your work: handrails, skirting boards, console brackets, fix couplers and swivel couplers (Norm EN-74) etc
  - Steel and aluminium antiskid platforms, class 3 and 5.
  - Coating with epoxy-polyester painting, zinced or hot galvanised.
  - Fast and easy assembly by gravity connection system.


SPECIFICATIONS

Advantage 1.Modular System of frames and gateways.
2.Complete range of accessories.
3.Coating with Epoxi-polyester painting, zinced or hot galvanised.
4.Fast and Easy Assembly.
Assembly 1. Place the jack screws in the ground and level vertically the jack screws with a support bar and a spirit level.
2. Place the scaffolding frame on the jack screws and brace the frames with the diagonal and horizontal bars.
3. Place the platforms and insert the safety lock in the frames and platforms. Use aluminium board platform with window and ladder to go up to the top level or different floors on the scaffolding.
4. Place the transverse and horizontal skirting boards in position in order to avoid the falling of small things.
5. Place the handrails on the outside of the scaffold, on the side where no work will be carried out.
6. Check the entire structure and use our different anchorage systems to fix scaffolding to the face of a building: tubes with hook etc. The frames should be anchored at maximum height of 4 metres, and 6 metres, length.
7. When we have reached the height marked, the so-called finish should be fitted in position (frame supplements, guard rail ends and guard rails).